TLS Offshore Containers & TLS Energy
  • Home
    • About us
    • Quality, Health, Safety and Environment
    • Manufacturing standards
    • Container certificates
  • Containerised solutions
    • Battery energy storage system (BESS) container
    • Intelligent pressurised container | MUD logging cabin
    • Laboratory container | workshop container | Equipment containers
    • Offshore accommodation cabin | office container
    • Reefer container | Refrigerated container
    • Flexible grid tied battery storage system
    • Temporary refuge shelter | Toxic gas refuge | Safe haven
    • Intelligent waste water treatment container
    • Fresh water generator container
  • Cargo Containers
    • Offshore closed containers
    • Half height container
    • Cargo basket
    • Cutting skip, waste skip
    • Drum basket
    • Offshore Tank
    • Mini container
    • Open top container
  • Product photos & videos
  • News & Blogs
  • Contact us

TLS news & blogs

Pressurised Laboratory cabin, pressurised workshop container, mud logging unit, mud logging cabin, pressurised modules, Offshore Pressurised Modules

12/24/2020

 
PRESSURISED LABORATORY CABIN, PRESSURISED WORKSHOP CONTAINER, MUD LOGGING UNIT, MUD LOGGING CABIN, PRESSURISED MODULES, OFFSHORE PRESSURISED MODULES

DNV 2.7-1, A60 Fire Rated and Zone I / zone II
Flexible and customised dimension and layout, 10ft/12ft/15ft/16ft/20ft/26ft/40ft etc
Lead time: 3-4 months.

which includes:
Engineering : Structural drawings, Architectural drawings and Documentation package c/w as built drawings and Certifications (CSC certificate, DNV2.7-1/EN12079 certificate, A60/Zone 1/Zone 2 certificate of conformity).

Fabrication : Structural materials to DNV 2.7-1 and A60 fire rated specification, Welding procedures, Welding inspections and Secondary steel provisions.

Assembly : 1 x A60 Main door, 1 x A60 Escape hatch, A60 Thermal Insulation, 1 x B15 Airlock Door w/ viewing glass, self- fabricated internal panel for wall, ceiling and airlock compartment.

Testing and Inspection: MPI and load testing in accordance with  DNV 2.7-1,  A60 insulation certification by DNV and Factory Acceptance Test (FAT) , Pressurised, Fire and Gas System, 

Electrical Work : Lighting and small power Distribution Board(DB) c/w circuit breakers, Cabling within Laboratory unit for lighting and power points, Conduit wiring for lightings, Trunking wiring for 220V, 8 x Double gang 230V 13A switch socket (Non-Ex), 3 x IP rated 2x36W fluorescent lighting, 1 x Non Ex rated light switch, MCT frames c/w MCT inserts, Earth bosses, 1 x Exe PJB at recessed area.

Safety Equipment : Purge, Pressurized, Fire and Gas Control Panel, 2 x CH4 Detector, 1 x H2S Detector, 1 x Smoke Detector, 1 x Heat Detector, Pressure Switches and gauge, 1 x Ex Loss of Pressure Alarm, A60 Shutdown dampers, 1 x Emergency Lightings, 1 x Emergency Shut-down Button, 1 x Ex-proof Pressurisation Blower set & 1 x DNV 2.7-1 compliance lifting sling set.

Air Conditioning System: 1 set 14,000BTU Split System c/w indoor evaporator set, indoor compressor set, indoor aircon circuitry box, outdoor copper condenser coil in stainless steel housing & Ex condenser motor.
(20ft cabin)
 
Air Conditioning System: 2 set 14,000BTU Split System c/w indoor evaporator set, indoor compressor set, indoor aircon circuitry box, outdoor copper condenser coil in stainless steel housing & Ex condenser motor.
(40ft cabin)

Furnishing : N.A.

Painting Work : Preparation : Blasting to S.A. 2.5, Painting System : Three (3) coat System of 1st coat (65micron) with zinc rich epoxy primer, 2nd coat (75micron) with red lead epoxy primer, final coat (50micron) with Polyurethane coat. 

Please download Pressurised cabin product brochure for reference. 
Please don't hesitate to contact us at [email protected] for any inquiries. 

PRESSURISED LABORATORY CABIN, PRESSURISED WORKSHOP CONTAINER, MUD LOGGING UNIT, MUD LOGGING CABIN
PRESSURISED LABORATORY CABIN, PRESSURISED WORKSHOP CONTAINER, MUD LOGGING UNIT, MUD LOGGING CABIN


Comments are closed.

    Archives

    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    November 2019
    October 2019
    September 2019
    July 2019
    June 2019
    May 2019
    February 2019
    October 2018
    September 2018
    August 2018
    June 2017
    June 2016
    June 2015
    June 2014
    December 2013

    Categories

    All
    A60
    Accommodation Cabin
    ADNOC
    Age System65288bess
    Commercial And Industrial & Microgrid Energy Storage System
    Container Accessories
    Container Standards
    Container Test
    CUTTING SKIPS
    Drop Test
    Dry Container
    ESS Container
    FEA
    Feedback From Clients
    FREEZER
    Iso Container
    Laboratory Container
    LIFTING TEST
    MCC Shelter
    |MWD/LWD Cabin
    NEGATIVE PRESSURE
    Offshore Accommodation Module
    Offshore Living Quarter
    Offshore Tank
    Offshore Workshop Container
    POSITIVE PRESSURE
    Pressurised Container
    PROCESS OF CONTAINER
    Reefer Container
    Refrigerated
    Refrigerated Container
    SEWAGE TREATMENT
    Temperature Control
    Temporary Refuge
    Temporary Refuge (TR) Shelter
    TLS OFFSHORE CONTAINER
    WATER TIGHTNESS
    WELDING INSPECTION
    Workshop Container

Featured products
​Battery energy storage system (BESS) container
​
Intelligent pressurised container/MWD cabins
Offshore laboratory container, Workshop container
Offshore ccommodation container
Offshore reefer container
​
​Temporary refuge (TR) shelter, toxic gas refuge (TGR)​

Company
About us

News & Blogs
Product photos & videos
Privacy policies
​Terms and conditions
Contact us
Communities
Facebook
​Twitter
Linkedin
Instagram
​Pinterest
​Flickr
Contact us
Email: [email protected]
Hotline: +65-89601885; +65-31386967; ​
All Rights Reserved 2020 © TLS Offshore Containers / TLS Energy
  • Home
    • About us
    • Quality, Health, Safety and Environment
    • Manufacturing standards
    • Container certificates
  • Containerised solutions
    • Battery energy storage system (BESS) container
    • Intelligent pressurised container | MUD logging cabin
    • Laboratory container | workshop container | Equipment containers
    • Offshore accommodation cabin | office container
    • Reefer container | Refrigerated container
    • Flexible grid tied battery storage system
    • Temporary refuge shelter | Toxic gas refuge | Safe haven
    • Intelligent waste water treatment container
    • Fresh water generator container
  • Cargo Containers
    • Offshore closed containers
    • Half height container
    • Cargo basket
    • Cutting skip, waste skip
    • Drum basket
    • Offshore Tank
    • Mini container
    • Open top container
  • Product photos & videos
  • News & Blogs
  • Contact us