Why would you want TLS offshore workshop container instead of a garage or shed? There are a number of advantages that make it a better choice.
- Portability
- Customization
- Durability
- Offshore containers shall be tested according to the requirements of four-point lifting and two-point lifting respectively.
- During the lifting test, the lifting angle should be the design angle.
- The lifting process should be carried out smoothly to avoid obvious inertial load.
- The deformation measurement of the beam and the integrity inspection of the offshore container should be carried out after keeping the lifting state for 5 minutes.
FOUR-POINT LIFTING
- When lifting, a uniform load equivalent to 2.5R-T should be placed in the box.
- During the test, the deformation of the beam should not exceed 1/300 of the beam span. After the test, the container shall not show significant permanent deformation or damage.
TWO-POINT LIFTING (DIAGONAL LIFTING TEST)
- Select two lifting lugs at diagonal positions for lifting. When lifting, a uniform load equivalent to 1.5R-T should be placed in the container.
- If the container is not geometrically symmetrical, the lifting test shall be carried out on the two diagonal corners respectively.
- After the test, the container shall show no obvious permanent deformation or damage.
R - maximum allowable total mass of offshore container and loaded cargo (without spreader)
T - Empty mass of offshore container including attachments (without spreader)
The TLS containers will not promote the next production step until the lifting test is passed.
With the gradual deepening of the development and utilization of oil and gas resources by human beings, oil and gas exploration and development have shifted from the shallow continental shelf to the deep sea, drilling engineering operations must also be carried out in the ocean away from the continental shelf.
In the event of a fire, explosion, leakage or other critical situation on the platform, the personnel on board can escape to the temporary refuge shelter, guarantee the life safety of the personnel in the temporary shelter within a certain period, and organize the person discuss the escape strategy, and gain time to be rescued.
Features of temporary refuge shelter provided by TLS:
In the event of a fire, explosion, leakage or other critical situation on the platform, the personnel on board can escape to the temporary refuge shelter, guarantee the life safety of the personnel in the temporary shelter within a certain period, and organize the person discuss the escape strategy, and gain time to be rescued.
Features of temporary refuge shelter provided by TLS:
- The positive pressure system is designed to maintain a certain positive pressure in the temporary shelter compared to the outdoor atmosphere during emergency conditions, preventing toxic gases from outside the container from entering the temporary shelter.
- The compressed air is stored in the air bottle in the shelter, which can maintain the breathing needs of all the people who escaped to the temporary shelter on the living platform within a certain period.
- The structure complies with the DNV2.7-1 design, and the thermal insulation and fire protection standards of the shelter are A60 level, ensuring its fire-resistant integrity within 60 minutes.
- The HVAC system should ensure that the heat on the enclose does not exceed the maximum human tolerance, can resist thermal stress, and can last for 60 minutes in an emergency.
- The backup supply can ensure that the emergency power supply can activate the HVAC and lighting systems in the event of a mains power cut.