BESS containers: Custom, Design, Manufacturing & EPC services

Purpose-built battery energy storage, engineered around your project—not a fixed product catalogue.

Image description

Built around your operating reality

One manufacturing partner.



A clearer route to deployment.

From basic enclosure to fully integrated system, every BESS solution is configured for your energy target, site conditions and commercial model.

Choose your level of integration

Three integration levels for different project scopes

Three BESS container delivery levels and describes EPC support from concept development through commissioning.

01

Container enclosure

A configurable foundation for teams integrating their own battery, PCS and controls.

Image description

01 — Start with structure

02

Semi-integrated

Battery racks and selected auxiliaries, with flexibility where your project needs it most.


Image description

02 — Balance speed & control

03

Fully integrated

A grid-ready solution with thermal management, protection and complete electrical integration.

Image description

03 — Deploy with certainty

Core platform specifications

Configured for the field.

Energy capacity

3.73–6.26 MWh

Cooling

Liquid / air cooled

Protection

IP55 · C5

Operating range

−30°C to +55°C

GRID SERVICES

Grid-support functions

From power smoothing and energy shifting to frequency response and active power reserve, a BESS can support multiple grid operating strategies.

01

Ramp Rate Control / Power Smoothing

Manages the rate of power output changes to support smoother transitions and reduce impact on the grid.

02

Energy Shifting

Stores energy during low-demand periods and dispatches it when demand is higher.

03

Custom Power Profiles / Schedules

Allows project-specific power output schedules to match changing energy demand.

04

Grid Voltage Control

Supports stable grid voltage levels and reliable power system operation.

05

Power Frequency Response — PFR / P(f)

Helps maintain consistent system frequency and supports grid stability.

06

Peak Load Shaving

Reduces grid demand during peak periods to improve overall system efficiency.

07

Reverse Power Protection

Prevents unintended reverse power flow to protect the grid and connected equipment.

08

Active Power Reserve — APR

Provides backup power during sudden demand increases or supply shortfalls.

09

Enhanced Frequency Response — EFR / AFRR / SRL

Responds quickly to frequency changes to support restoration and grid stability.

10


Frequency Containment / Plant-Level Inertia

Helps keep frequency within defined limits and contributes to power-system resilience.

YOUR NEXT PROJECT

Let's engineer what's next

Share your application, specification, quantity and delivery location. Our team will help turn the requirement into a buildable solution.


Please download Energy Storage System (ESS) Containers brochure for reference.