TLS Energy provides DSX POD enclosures with an integrated delivery approach: supply the enclosure, install the racks, connect the internal systems, flush and pressure-test the cooling loop, then power on and test the assembled unit before shipment. This sequence brings assembly and verification into the factory, helping customers receive a coordinated package with clearly defined interfaces. For projects involving liquid cooling and interconnected racks, the value lies in checking how the components work together before the enclosure reaches its destination.
A DSX POD enclosure provides the physical structure around the equipment and its supporting infrastructure. The enclosure design must account for equipment placement, service access, cable routing and cooling connections. These requirements influence each other. Rack positions affect pipe routes, while access requirements influence the location of doors and internal clearances. Addressing these relationships during enclosure integration helps avoid installation conflicts later. TLS Energy’s delivery scope should therefore be defined around the complete assembly and the customer’s agreed project requirements.
Rack installation establishes the internal arrangement of the DSX POD enclosure. Racks need suitable mounting positions and secure attachment, with sufficient space for connections and maintenance. The layout should also accommodate the equipment that will occupy each rack. Dimensions, loading requirements and access arrangements must be confirmed against the project design. Installing racks at the factory allows the enclosure and rack arrangement to be checked together, giving the integration team an opportunity to resolve physical mismatches before dispatch.
Connecting the racks turns the enclosure into an integrated assembly. Depending on the agreed scope, this work can include electrical distribution, grounding, communications, control wiring and cooling connections. Each connection should follow approved drawings and component requirements. Clear identification of cables, pipes and connection points supports inspection and later maintenance. NVIDIA describes factory integration as a central feature of the DSX POD approach, moving cabling, wiring, piping and functional validation into the manufacturing stage. NVIDIA DSX POD overview
The cooling loop requires particular attention because installation quality affects fluid circulation and equipment cooling. Pipework, manifolds, valves and rack connections must form a circuit that matches the approved design. Connections also need to remain accessible for inspection and service. Before commissioning begins, the integration team should confirm component compatibility and the boundaries of the supplied cooling system. Establishing those boundaries clarifies which cooling functions belong inside the enclosure and which depend on infrastructure provided at the installation site.
Flushing the cooling loop prepares the assembled circuit for operation. Fabrication and installation can leave particles or other contamination inside pipework. A controlled flushing procedure helps remove this material before normal circulation begins. The procedure should follow the requirements of the installed components and the specified coolant system. Cleanliness acceptance criteria, flushing arrangements and fluid handling need to be agreed for the project. Completing this work at the factory gives the team access to the assembled loop while corrective work remains practical.
Pressure testing checks the cooling loop’s integrity before the unit is switched on. The test procedure must specify a suitable medium, pressure, duration and acceptance criteria based on the system design and component limits. Inspection focuses on joints, fittings and other potential leakage points. Any defect identified during testing requires correction and appropriate verification before the assembly proceeds. Flushing and pressure testing serve different purposes: flushing addresses internal cleanliness, while pressure testing checks whether the circuit meets its specified integrity requirements.
After the cooling loop passes the required checks, the assembled unit can proceed to controlled startup and functional testing. Switching on provides an opportunity to verify the operation of the equipment included in TLS Energy’s contracted scope. The test plan should define the required checks, operating conditions and acceptance criteria. Where applicable, these checks may cover controls, sensors, alarms and cooling circulation. The extent of operational testing depends on the installed equipment and the utilities available at the factory test location.
Factory testing provides useful evidence for shipment acceptance and subsequent commissioning. Test records should identify the inspected assembly, describe the procedures performed and document results against agreed criteria. Outstanding items need clear ownership and resolution requirements. Customers should distinguish between testing the enclosure’s integrated infrastructure and validating a complete computing workload. The purchase specification should state which equipment is installed, which functions are demonstrated and which activities remain for site commissioning. This clarity helps align delivery expectations with the actual supplied package.
For customers considering TLS Energy DSX POD enclosures, procurement discussions should begin with the required delivery boundary. Confirm the enclosure configuration, rack arrangement, internal connections, cooling loop scope and factory acceptance requirements before manufacturing starts. Site teams can then prepare the external services and receiving arrangements around those interfaces. An enclosure that has been assembled, connected, flushed, pressure-tested and powered on under an agreed test plan gives the receiving team a documented starting point for installation and commissioning at the destination.
Meta description: A pressurised PDU container provides a dedicated enclosure for power distribution equipment in projects that need a controlled workspace. Its layout is planned around the equipment, cable access and the way the container will be used.
What is a pressurised PDU container?
A PDU distributes electricity to connected equipment. When the equipment is installed in a hazardous offshore or industrial area, the project may require it to be housed in a pressurised container. The container creates a protected space for the specified equipment and is designed to suit the project’s operating conditions.
TLS has supplied pressurised PDU containers as a distinct product type. They are separate units, just as a pressurised work cabin and a pressurised office shop are separate units. Each has its own purpose and layout; they are not three functions combined in one container. ([TLS pressurised container solutions]
The equipment determines the layout
Power distribution equipment needs room for installation, operation and routine checks. The position of the panels, the direction from which people access them, and where cables enter the container all affect the layout.
These details are easier to plan before the container is built. Early coordination helps the equipment fit the space and keeps access routes clear. It also gives the project team a chance to agree where the container connects with equipment and services outside it.
Pressurisation is part of the overall design
In simple terms, a pressurised container supplies air to keep its internal pressure above the surrounding atmosphere. This can help limit outside air entering the enclosure, when the system is designed and operated for the project’s conditions.
The container, the power equipment and the pressurisation arrangement need to work together. The protection required depends on the site and project specification, so the same setup should not be assumed for every PDU container. TLS configures pressurised containers to the project requirements, with applicable standards and certification confirmed for each unit. ([TLS pressurised container solutions]
A purpose-built container for a clear role
A pressurised PDU container gives power distribution equipment a dedicated place within the project. When the equipment arrangement, cable access and protection requirements are considered together, the container is easier to install and use as intended.
For TLS, a PDU container is one specific configuration in a broader range of pressurised units. The final arrangement follows the equipment and project requirements, while work cabins, PDU containers and office shops remain distinct products designed for different uses.
FAQ
What does PDU mean?
PDU means power distribution unit. It distributes electricity to connected equipment.
Does every project need the same pressurisation arrangement?
No. The required arrangement depends on the project and its operating environment.
Can the container layout be planned around the equipment?
Yes. Equipment positions, cable access and normal operating needs can be considered during project design.
Meta description: Offshore functional containers are designed around the equipment they will house. Learn how enclosure layout, mounting provisions, openings, interfaces and offshore requirements come together in a project-specific container.
Direct answer
An offshore functional container is more than a standard box with equipment added later. Its dimensions, internal arrangement, structural provisions and service interfaces need to reflect the equipment it will house and the way the unit will be transported, installed and used. TLS designs and manufactures the container enclosure, coordinating agreed equipment positions and interface provisions with the customer’s requirements. The customer or its appointed vendors supply and integrate the process equipment and systems.
Start with the equipment’s role in the project
Offshore containers can serve very different purposes: a laboratory, workshop, control room, generator space or equipment room. The label alone does not determine the design. What matters is the equipment to be installed, the space people need to work around it, and how the container connects with the wider project.
For example, a laboratory container may need prepared locations for benches and customer-supplied instruments. A workshop may need clear working and access areas around machinery. An equipment room may require planned cable entries and mounting provisions. Each use leads to a different enclosure arrangement, even when the external container format is similar.
TLS’s offshore functional-container range includes laboratory, workshop, crane-support, generator, ROV/control and equipment containers. The company describes project-specific layouts, equipment loads, operating environments and certification needs as design inputs. ([TLS Offshore Workshop, Laboratory and Equipment Containers]
Make the container fit the equipment and its interfaces
The equipment list affects more than the floor plan. Weight and centre of gravity, footprint, access for maintenance, cable routes, openings and connection points can all influence the container design. Identifying these requirements early helps coordinate the enclosure with the equipment supplier’s installation needs.
This coordination can include equipment locations, mounting arrangements, cable or pipe entries, space for customer-specified systems, and access for operation or servicing. The exact provisions depend on the project drawings and agreed supply boundary. A reserved opening or interface should not be mistaken for the equipment or system itself being included.
TLS supplies the container enclosure and the provisions defined for that container scope. Process equipment, laboratory instruments, workshop tools, generator packages, control systems and other customer equipment are supplied by the customer or its appointed vendors unless a different scope is expressly agreed. Clear interface drawings help each party understand what is prepared in the enclosure and what must be installed by others.
Design for offshore handling and the final location
An offshore functional container needs to suit its transport and installation route as well as its permanent duty. Lifting and handling requirements, equipment loads, environmental exposure and the final site arrangement all need to be considered together. Internal equipment positions can affect structural loading and handling, so late changes to the equipment arrangement may require the container design to be reviewed.
The applicable offshore-container and project requirements should be established for the specific unit. TLS lists DNV 2.7-1, NORSOK, ATEX/IECEx and SOLAS/IMO among requirements that may apply to its functional containers, depending on the project. The relevant standards and certification scope must be confirmed for the intended installation; a list of possible standards is not a claim that every container carries every certification. ([TLS functional-container information]
Why early coordination reduces site complications
When equipment positions, access, openings and connection points are coordinated before fabrication, the container is more likely to arrive ready for the customer’s installation work. It can reduce avoidable changes such as relocating an entry, adjusting a mounting point or resolving a clash between equipment and an access route after delivery.
This does not remove the need for the customer’s equipment vendors to complete their own installation and system checks. It gives the project a defined physical interface between the enclosure and the systems that will be installed inside it. The container drawings, equipment data and responsibility matrix should describe that interface clearly.
A container engineered around its project role
The value of an offshore functional container lies in how well the enclosure supports its intended role. A project-specific layout, suitable structural provisions and well-coordinated interfaces give customer equipment a defined place within a transportable offshore structure. TLS focuses on engineering and manufacturing that enclosure to the agreed project requirements, while the customer and its vendors provide the equipment and systems that make it operational.
FAQ
What is an offshore functional container?
It is an offshore container designed for a defined use such as laboratory work, workshop activities, control, power generation or equipment housing.
Does TLS supply the equipment installed inside the container?
TLS supplies the container enclosure and agreed provisions. The customer or its appointed vendors supply the process equipment and systems unless the contract defines another scope.
Can the enclosure be designed around customer equipment?
Yes. Equipment dimensions, weights, locations, access needs and connection requirements can inform the container design and interface provisions.
Which standards apply?
Requirements such as DNV 2.7-1, NORSOK, ATEX/IECEx or SOLAS/IMO may be specified depending on the project and intended installation. Applicability and certification scope are confirmed for each unit.
Why define interface points before fabrication?
Early coordination helps align equipment positions, access, openings and connections with the enclosure, reducing the chance of avoidable modifications after delivery.