TLS Offshore Containers & TLS Energy
  • Home
    • About us
    • Quality, Health, Safety and Environment
    • Manufacturing standards
    • Container certificates
  • Containerised solutions
    • Battery energy storage system (BESS) container
    • Intelligent pressurised container | MUD logging cabin
    • Laboratory container | workshop container | Equipment containers
    • Offshore accommodation cabin | office container
    • Reefer container | Refrigerated container
    • Flexible grid tied battery storage system
    • Temporary refuge shelter | Toxic gas refuge | Safe haven
    • Intelligent waste water treatment container
    • Fresh water generator container
  • Cargo Containers
    • Offshore closed containers
    • Half height container
    • Cargo basket
    • Cutting skip, waste skip
    • Drum basket
    • Offshore Tank
    • Mini container
    • Open top container
  • Product photos & videos
  • News & Blogs
  • Contact us

TLS news & blogs

IEC 60079-13:2017

8/15/2020

 
IEC 60079-13:2017 gives requirements for the design, construction, assessment, verification and marking of rooms used to protect internal equipment:
– located in a Zone 1 or Zone 2 or Zone 21 or Zone 22 explosive atmosphere without an internal source of gas/vapour release and protected by pressurization;
– located in a Zone 2 explosive atmosphere with or without an internal source of gas/vapour release and protected by artificial ventilation;
– located in a non-hazardous area, containing an internal source of gas/vapour release and protected by artificial ventilation;
– located in a Zone 1 or Zone 2 or Zone 21 or Zone 22 explosive atmosphere containing an internal source of gas/vapour release and protected by both pressurization and artificial ventilation.
The term "room" used in this document includes single rooms, multiple rooms, a complete building or a room contained within a building. A room is intended to facilitate the entry of personnel and includes inlet and outlet ducts. An acoustic hood and other like enclosures designed to permit the entry of personnel can be considered as a room.
This document also includes requirements related safety devices and controls necessary to ensure that artificial ventilation, purging and pressurization is established and maintained.
A room assembled or constructed on site, can be either on land or off-shore. The room is primarily intended for installation by an end-user but could be constructed and assessed at a manufacturer’s facility, where the final construction such as ducting can be completed on site.
This document does not specify the methods that may be required to ensure adequate air quality for personnel with regard to toxicity and temperature within the room. National or other regulations and requirements may  exist to ensure the safety of personnel in this regard.
This second edition cancels and replaces the first edition published in 2010. This edition constitutes a technical revision.
This edition includes the following significant technical changes with respect to the previous edition:
a) modification of the title of this document to include artificially ventilated room "v" in addition to pressurized room "p";
b) addition of types of protection "pb", "pc", and "vc" and removal of types of protection "px", "py", "pz" and "pv";
c) definition of the differences between pressurization and artificial ventilation types of protection;
d) removal of protection of rooms with an inert gas or a flammable gas from the scope of this document;
e) addition of an informative annex to include examples of applications where types of protection pressurization or artificial ventilation or pressurization and artificial ventilation can be used and associated guidelines.

Comments are closed.

    Archives

    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    November 2019
    October 2019
    September 2019
    July 2019
    June 2019
    May 2019
    February 2019
    October 2018
    September 2018
    August 2018
    June 2017
    June 2016
    June 2015
    June 2014
    December 2013

    Categories

    All
    A60
    Accommodation Cabin
    ADNOC
    Age System65288bess
    Commercial And Industrial & Microgrid Energy Storage System
    Container Accessories
    Container Standards
    Container Test
    CUTTING SKIPS
    Drop Test
    Dry Container
    ESS Container
    FEA
    Feedback From Clients
    FREEZER
    Iso Container
    Laboratory Container
    LIFTING TEST
    MCC Shelter
    |MWD/LWD Cabin
    NEGATIVE PRESSURE
    Offshore Accommodation Module
    Offshore Living Quarter
    Offshore Tank
    Offshore Workshop Container
    POSITIVE PRESSURE
    Pressurised Container
    PROCESS OF CONTAINER
    Reefer Container
    Refrigerated
    Refrigerated Container
    SEWAGE TREATMENT
    Temperature Control
    Temporary Refuge
    Temporary Refuge (TR) Shelter
    TLS OFFSHORE CONTAINER
    WATER TIGHTNESS
    WELDING INSPECTION
    Workshop Container

Featured products
​Battery energy storage system (BESS) container
​
Intelligent pressurised container/MWD cabins
Offshore laboratory container, Workshop container
Offshore ccommodation container
Offshore reefer container
​
​Temporary refuge (TR) shelter, toxic gas refuge (TGR)​

Company
About us

News & Blogs
Product photos & videos
Privacy policies
​Terms and conditions
Contact us
Communities
Facebook
​Twitter
Linkedin
Instagram
​Pinterest
​Flickr
Contact us
Email: [email protected]
Hotline: +65-89601885; +65-31386967; ​
All Rights Reserved 2020 © TLS Offshore Containers / TLS Energy
  • Home
    • About us
    • Quality, Health, Safety and Environment
    • Manufacturing standards
    • Container certificates
  • Containerised solutions
    • Battery energy storage system (BESS) container
    • Intelligent pressurised container | MUD logging cabin
    • Laboratory container | workshop container | Equipment containers
    • Offshore accommodation cabin | office container
    • Reefer container | Refrigerated container
    • Flexible grid tied battery storage system
    • Temporary refuge shelter | Toxic gas refuge | Safe haven
    • Intelligent waste water treatment container
    • Fresh water generator container
  • Cargo Containers
    • Offshore closed containers
    • Half height container
    • Cargo basket
    • Cutting skip, waste skip
    • Drum basket
    • Offshore Tank
    • Mini container
    • Open top container
  • Product photos & videos
  • News & Blogs
  • Contact us