TLS Offshore Containers & TLS Energy
  • Home
    • About us
    • Quality, Health, Safety and Environment
    • Manufacturing standards
    • Container certificates
  • Containerised solutions
    • Battery energy storage system (BESS) container
    • Intelligent pressurised container | MUD logging cabin
    • Laboratory container | workshop container | Equipment containers
    • Offshore accommodation cabin | office container
    • Reefer container | Refrigerated container
    • Flexible grid tied battery storage system
    • Temporary refuge shelter | Toxic gas refuge | Safe haven
    • Intelligent waste water treatment container
    • Fresh water generator container
  • Cargo Containers
    • Offshore closed containers
    • Half height container
    • Cargo basket
    • Cutting skip, waste skip
    • Drum basket
    • Offshore Tank
    • Mini container
    • Open top container
  • Product photos & videos
  • News & Blogs
  • Contact us

TLS news & blogs

Do you know how to produce a high-quality offshore container?

11/23/2022

 
​The production process and requirements for TLS offshore container are as below:
1. Produce the container frame and weld the container.
All primary structural welds are required to be welded by a class-certified welder, and full penetration welding is required. For containers that have passed the third-party inspection, they are sprayed according to the paint process, and the paint package is suitable for the marine environment

2. Install the floor.
First, calcium silicate plates were laid on the lower deck, then fixed steel mesh was installed on the surface, then the upper deck dressings were laid on the steel mesh, and finally the deck dressings were laid on the floor. After construction is complete, the flatness of the floor is measured and accepted by professional quality inspectors.

3. Lay down insulation material.
Fix the nails in advance at the locations where the rock wool insulation needs to be laid in the container. When attaching the nails, reserve space to make sure that the nails are firmly attached according to the standard.  Laying of rock wool ensures that the length of the overlapping surface is sufficient, and the joints are covered with fireproof tape.

4. Install water pipes, air pipes, and cable trays.
Pre-lay insulation. Reserve the supporting boom needed to install the pipe on the top plate of the container to ensure that the pipe is straight and firmly secured.

5. Install interior trim wall panels.
Install the fixing slot of the fixing plate first, and then install the inner panel in the fixing slot. Before installation, ensure that the surface of the wall panel and the ceiling is smooth and flat, and ensure that the splicing gap is neat and straight.

6. Install the furniture and appliances. The furniture in the container must be installed and secured according to the requirements and locations in the preliminary design drawings. The power connection of the relevant equipment shall be constructed in accordance with the regulations and must be inspected by qualified quality inspectors during this period.
​
7. Testing & Acceptance
TLS accepts client's on-site inspection, video inspection, graphic inspection, and other methods for acceptance. We will only ship the containers after they pass the acceptance.
 Produce the container frame and weld the container.
produce a high-quality offshore container

Comments are closed.

    Archives

    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    November 2019
    October 2019
    September 2019
    July 2019
    June 2019
    May 2019
    February 2019
    October 2018
    September 2018
    August 2018
    June 2017
    June 2016
    June 2015
    June 2014
    December 2013

    Categories

    All
    A60
    Accommodation Cabin
    ADNOC
    Age System65288bess
    Commercial And Industrial & Microgrid Energy Storage System
    Container Accessories
    Container Standards
    Container Test
    CUTTING SKIPS
    Drop Test
    Dry Container
    ESS Container
    FEA
    Feedback From Clients
    FREEZER
    Iso Container
    Laboratory Container
    LIFTING TEST
    MCC Shelter
    |MWD/LWD Cabin
    NEGATIVE PRESSURE
    Offshore Accommodation Module
    Offshore Living Quarter
    Offshore Tank
    Offshore Workshop Container
    POSITIVE PRESSURE
    Pressurised Container
    PROCESS OF CONTAINER
    Reefer Container
    Refrigerated
    Refrigerated Container
    SEWAGE TREATMENT
    Temperature Control
    Temporary Refuge
    Temporary Refuge (TR) Shelter
    TLS OFFSHORE CONTAINER
    WATER TIGHTNESS
    WELDING INSPECTION
    Workshop Container

Featured products
​Battery energy storage system (BESS) container
​
Intelligent pressurised container/MWD cabins
Offshore laboratory container, Workshop container
Offshore ccommodation container
Offshore reefer container
​
​Temporary refuge (TR) shelter, toxic gas refuge (TGR)​

Company
About us

News & Blogs
Product photos & videos
Privacy policies
​Terms and conditions
Contact us
Communities
Facebook
​Twitter
Linkedin
Instagram
​Pinterest
​Flickr
Contact us
Email: [email protected]
Hotline: +65-89601885; +65-31386967; ​
All Rights Reserved 2020 © TLS Offshore Containers / TLS Energy
  • Home
    • About us
    • Quality, Health, Safety and Environment
    • Manufacturing standards
    • Container certificates
  • Containerised solutions
    • Battery energy storage system (BESS) container
    • Intelligent pressurised container | MUD logging cabin
    • Laboratory container | workshop container | Equipment containers
    • Offshore accommodation cabin | office container
    • Reefer container | Refrigerated container
    • Flexible grid tied battery storage system
    • Temporary refuge shelter | Toxic gas refuge | Safe haven
    • Intelligent waste water treatment container
    • Fresh water generator container
  • Cargo Containers
    • Offshore closed containers
    • Half height container
    • Cargo basket
    • Cutting skip, waste skip
    • Drum basket
    • Offshore Tank
    • Mini container
    • Open top container
  • Product photos & videos
  • News & Blogs
  • Contact us