When the modular container needs fire and explosion protection and external cables need to be connected to the container, how to do it?
Use MCT (the multi-cable transit system) to ensure that the container meets the air tightness and pressure requirements.
MCT features:
Use MCT (the multi-cable transit system) to ensure that the container meets the air tightness and pressure requirements.
MCT features:
- Protects against fire, smoke, explosions, rodents and other hazards;
- Protects against the elements and hazards caused by weather as well as water, sand and dust from splashes or hoses;
- MCT, specifically designed for IEC, ATEX and AEX standards, can be used in hazardous areas;
- MCTs can provide certified gas-tightness to a catastrophic pressure of 2.5 bar (~36 psi) in demanding offshore applications, and they can easily meet onshore requirements aiming at maintaining a pressure slightly positive to atmosphere.
Key words:
#MCT #pressurised container #ATEX #IECEx #offshore container #workshop container #TLS #explosive atmospheres
#MCT #pressurised container #ATEX #IECEx #offshore container #workshop container #TLS #explosive atmospheres
Fire ratings such as A60 and H120 indicate the duration the doors and walls must be able to withstand a particular type of fire. A diagram shows you the container fire rating.
In view of the above fire protection requirements, how is the container usually insulated and fireproof in structure?
- 1. Laying marine fireproof dressing at the bottom of the box
- 2. Laying self-leveling
- 3. Laying rock wool
- 4. Paste aluminum film
- 5. Install the sandwich panel
Key words:
#A60 fire rating #H120 #insulate #fireproof #rock wool #sandwich panel
#A60 fire rating #H120 #insulate #fireproof #rock wool #sandwich panel
THE PROCESS OF CONTAINER MANUFACTURING
Step 1: a. preprocessing of sheet and section steel b. cutting and processing of section steel c. stamping
Step 2: a. welding prefabricationb. bottom frame fabrication c. end frame fabricationd. top side fabrication
Step 3: Welding assembly
Step 4: Sand paint (primer and paint)
Step 5: Internal installation of the structure (internal wall, ground), external installation (door, window)
Step 6: Decals and logos
Step 7: Performance test
Step 8: Interior decor
Step 1: a. preprocessing of sheet and section steel b. cutting and processing of section steel c. stamping
Step 2: a. welding prefabricationb. bottom frame fabrication c. end frame fabricationd. top side fabrication
Step 3: Welding assembly
Step 4: Sand paint (primer and paint)
Step 5: Internal installation of the structure (internal wall, ground), external installation (door, window)
Step 6: Decals and logos
Step 7: Performance test
Step 8: Interior decor
The customized ultra-wide laboratory container is being assembled, we will follow up every process in real time, and we will take every detail seriously.
Rest assured, products tailored to your needs are sure to satisfy you.