The specially designed ultra-wide explosion-proof lab container|workshop container| Pressure container is about to be delivered. Our technicians are cooperating with various inspections from the end customer and SGS to ensure that the performance of the container meets customer standards and industry standards.
TLS provides DNV2.7-1 standard | explosion-proof | which can be used in hazardous areas (ZONE 0, ZONE 1, AND ZONE 2) | special containers that meet A60 fire rating, we provide the independent certification from DNV | BV | LR | ABS | SGS.
Any requirements, please contact us directly:
E-mail: sales@tls-containers.com
Hotline: +65-65637288; +65-31386967
TLS provides DNV2.7-1 standard | explosion-proof | which can be used in hazardous areas (ZONE 0, ZONE 1, AND ZONE 2) | special containers that meet A60 fire rating, we provide the independent certification from DNV | BV | LR | ABS | SGS.
Any requirements, please contact us directly:
E-mail: sales@tls-containers.com
Hotline: +65-65637288; +65-31386967
Key words:
#DNV #BV #LR #ABS #SGS #DNV2.7-1 #ESS #BESS #A60 fire rating #explosion-proof #LAB # workshop container #TLS offshore containers
#DNV #BV #LR #ABS #SGS #DNV2.7-1 #ESS #BESS #A60 fire rating #explosion-proof #LAB # workshop container #TLS offshore containers
THE PROCESS OF CONTAINER MANUFACTURING
Step 1: a. preprocessing of sheet and section steel b. cutting and processing of section steel c. stamping
Step 2: a. welding prefabricationb. bottom frame fabrication c. end frame fabricationd. top side fabrication
Step 3: Welding assembly
Step 4: Sand paint (primer and paint)
Step 5: Internal installation of the structure (internal wall, ground), external installation (door, window)
Step 6: Decals and logos
Step 7: Performance test
Step 8: Interior decor
Step 1: a. preprocessing of sheet and section steel b. cutting and processing of section steel c. stamping
Step 2: a. welding prefabricationb. bottom frame fabrication c. end frame fabricationd. top side fabrication
Step 3: Welding assembly
Step 4: Sand paint (primer and paint)
Step 5: Internal installation of the structure (internal wall, ground), external installation (door, window)
Step 6: Decals and logos
Step 7: Performance test
Step 8: Interior decor
The customized ultra-wide laboratory container is being assembled, we will follow up every process in real time, and we will take every detail seriously.
Rest assured, products tailored to your needs are sure to satisfy you.
Rest assured, products tailored to your needs are sure to satisfy you.